Fujian opens a 649-km charging corridor for electric trucks

Its 23 charging and battery-swap stations sit no more than 100 km apart, and it is the first of eight such routes the province plans.

Share
The transport department page dates from June 2021 and puts the Fujian section’s two ends at Fuding and Zhao’an and gives its length as 649 km.
Map showing charging station route.

Electric heavy trucks now have a recharging corridor running north to south through Fujian province. On Oct. 1, a 649-kilometer route covering the whole Fujian section of the Shenyang–Haikou Expressway, from the Zhejiang border at Fuding to the Guangdong border at Zhao’an, opened as the province’s first “zero-carbon transport” demonstration line, with charging or battery-swap stations no more than 100 km apart.

The line has 23 stations for heavy trucks: 15 for charging and eight where drivers swap a drained battery for a charged one, according to Fujian Daily (福建日报).

Fujian built 47 heavy-truck stations from January through September, for 51 in all, and drivers can use any of them with a single scannable code through a provincial platform. Fujian’s provincial expressway company (福建省高速公路集团有限公司), which is building the stations with the provincial Department of Transport, says it plans 66 heavy-truck stations over the course of 2026. The province plans eight such lines totaling more than 3,000 km.

China wants many more such corridors. A Ministry of Transport (交通运输部) official said in July, Xinhua reported, that the country will build about 30,000 km of zero-carbon road freight corridors, and expects new-energy models to reach 40% of the heavy-truck market by 2030, with more than 1.6 million on the road.

Sources: 东南网 FJSEN (福建日报 Fujian Daily), 东南网 FJSEN, 中国交通新闻网 China Traffic News, 福建省交通运输厅 (Fujian transport department), 新华网 Xinhua

Editor: Ian Lamont